RBMK Control room | v6.3.5 | W.I.P

RBMK Control room | v6.3.5 | W.I.P

by Germanbluecat

👁 195 ❤️ 11 ⭐ 9 🔄 0
Created: Jun 1, 2026 Last modified: Jun 27, 2026 Shared: Jun 1, 2026

Description

#chernobyl #control #room #rbmk #nuclear #npp #reactor #powerplant

Instructions

_______________Work In Progress_______________ ______________SOME BASIC INFO______________ ____________________________________________ WP-1 = Water Pump 1 WP-2 = Water Pump 2 WP-3 = Water Pump 3 WP-4 = Water Pump 4 ____________________________________________ AZ-5 = Lower Power to 0% - 0 Mw/s AZ-4 = Lower Power to 20% - 400 Mw/s AZ-3 = Lower Power to 40% - 800 Mw/s AZ-2 = Lower Power to 50% - 1000 Mw/s AZ-1 = Lower Power to 80% - 1600 Mw/s ____________________________________________ INS = Insert Selected Rods EJC = Eject Selected Rods CLR = Clear Selected Rods ____________________________________________ SS-1 = Steam Seperator 1 SS-2 = Steam Seperator 2 ____________________________________________ ST-1 = Steam Turbine 1 ST-2 = Steam Turbine 2 ST-3 = Steam Turbine 3 ST-4 = Steam Turbine 4 ____________________________________________ MSRV = Main Steam Relief Valve LCP = Local Core Protection ____________________________________________

Project Details

Visibility
Visible
Comments
Enabled